Specialist HV civil works
Built to last.
Reinforced concrete, transformer bunds, ducting and structural works for 11kV–132kV substations — delivered safely for DNOs and Tier 1 contractors across the UK.
Trusted by Tier 1 contractors and DNOs
End clients include UK Power Networks and SSE.
Family-built.
Industry-proven.
Established in 2013, Mezini Brothers Ltd is a family-run civils contractor with over 25 years of construction experience. We started on the tools — on substations, transformer compounds and live grid connections — and that hands-on grounding still shapes how every project leaves our site.
With Albanian roots, we take pride in our strong work ethic and family values. We focus on reliability, craftsmanship and safety in every project we deliver.
- 11–132 kV HV experience
- 2013 Established
- UK Nationwide coverage
Safety first.
Quality always.
To deliver high-quality complex projects safely, efficiently and within agreed programmes and budgets — while creating lasting value for everyone involved.
Safe delivery
Safety is our top priority on every project. Full compliance, banksman-supervised excavation, substation entry protocols.
On time, on budget
We plan carefully and deliver within agreed timelines and budgets. No surprises, no scope creep.
Shared success
We want our clients, workforce and supply chain partners to take pride in both the methodology and the final result.
Projects delivered.

Radnor T1 & T3 Transformer Bund
Weight-bearing plinths and oil-containment bunds for two 33kV transformers, with engineered fill for full transformer-oil retention.

Peterborough East Grid Substation
Reinforced concrete raft foundation for an elevated switchroom, integrated with the existing site earthing system.

Chandos Road Battery Storage
Cable trenches, foundations, reinforced concrete slab, pad foundations and surrounding walls for a new battery storage facility.

Honington Primary T1 & T2 Replacement
Civil and structural works for new primary transformers. Precast fire-protection walls rated to four hours, full oil containment and reinstatement.

Wix Primary Substation, Colchester
Installation of FastBase pre-fabricated transformer bases — fast install, low carbon, significantly less concrete than cast-in-situ.

Stirling Way North, Peterborough
200 linear metres of excavations, 500+ metres of ducting, cable pulling and multiple structural bases for Morrison Energy Services.
The standard we deliver.
Strict dimensional control, high-quality concrete finishes and full site reinstatement — every time. Three recent transformations, from arrival to hand-over.






What we do.
-
Excavation & trenching
Cable routes, substation compounds, formation works — controlled excavation around live services, banksman-supervised. CPCS-certified operators throughout.
-
Reinforced concrete & bunds
Cast in-situ transformer bases, plinths and oil-containment bunds. High-strength concrete, strict dimensional control to DNO specifications.
-
Ducting & cable pulling
HV and LV cable management with NPORS-certified Grundowinch operators and traceable cable schedules.
-
Pre-cast & structural works
Trough systems, blast and retaining walls, fire-rated walls, chambers, cover slabs and gate posts. Structural alterations within live compounds and restricted sites.
-
Site preparation & enabling works
Ground preparation, service detection, formation levels and compound setup — getting sites ready for main works safely and on programme.
Great projects stem from trust and strong relationships — we deliver work that creates lasting value for our clients and the communities they serve.
Tender, conversation,
or a coffee on site.


Quality · Teamwork
Shared success








